Utility-scale field work, done to the manufacturer’s procedure.

Retrofit, remediation, commissioning and site inspection crews mobilized from Calgary, remote O&M between visits, and an auditable record for every unit we touch.

Anonymized closeout extract99 of 921 trackers · 3 field days
98/99

closed, all 4 steps signed off

75

corrected from out-of-spec gap

1

held open on stripped fastener

Day 1Day 2Day 3
Closed (98) Open exception, X (1) In scope, not started (822)
Select a tracker bar to inspect the anonymized closeout record.
Real anonymized counts from a damper arm re-spacing job. Download 6-page PDF

What we do

Repeatable field campaigns across hundreds of trackers, and the remote O&M that keeps a site healthy between visits.

Tracker campaigns
Retrofits, bracket remediations and component swaps repeated across hundreds of units, executed to the OEM’s procedure as written.
Commissioning support
Walkdowns, punch lists and functional checks on solar and BESS equipment, tracked per asset.
Construction quality inspection
Electrical and tracker installation inspected during the build, with deficiencies tracked to close. See the scope
Tracker controls and communications
Controller and firmware configuration, site network troubleshooting and SCADA integration. See the scope
Remote O&M support
Alarm triage, remote troubleshooting and dispatch between site visits. How it works
Receiving and kitting
Parts received and kitted by block. Removed parts tagged for RMA and reconciled at closeout.
Inspections and audits
Condition surveys and as-found records with photos and locations, to plan the next campaign from.
Seasonal O&M crews
A crew lead and trained employees for campaign work your site team can’t absorb.
Technical services
Commissioning plans, retrofit work instructions and technical reviews. See the scope

Why manufacturers and owners call us

  • Manufacturer-side experience

    We have supported GameChange Solar tracker projects in Canada since 2021, so crews follow the OEM’s procedure and close out with the evidence a warranty campaign requires.

  • A Calgary crew, not a fly-in team

    No cross-border travel to schedule around, and people who already know Alberta sites, access rules and winter conditions.

  • Pricing from measured pace

    Repeat repairs run block by block and quoted from a paid trial block, with remote triage so fewer truck rolls are wasted.

  • Audit-ready closeout

    Signed-off steps, serials, torque checks, photos and open exceptions for every tracker, ready for warranty claims, lenders and future campaigns.

How a job runs

Four stages, each one visible to you as it happens.

  1. Scope and site walk

    We walk the site, confirm counts, access rules and outage windows, and agree what done means for each unit. Before the crew mobilizes you get the lead’s name, tickets and phone number.

  2. Paid trial block

    The crew works one block at an agreed rate to measure real pace on your site, and we quote the rest of the campaign per unit or per crew-day from that pace. Your trainer or field engineer can sign off our lead on the procedure. The price holds for the agreed scope, and extra work is priced only with your approval.

  3. The main run

    A named Hemora lead is on site whenever the crew is. Each evening you get a report: units done, exceptions, parts used and returned, crew-hours and safety events. If a date is at risk or your outage moves, the lead tells you that day.

  4. Closeout

    You keep the per-unit records, exceptions log, parts reconciliation and training sign-offs, delivered as a PDF closeout package plus a spreadsheet and photo export.

Found it? Fixed it.

Campaigns turn up more than the base scope: a damaged node, a cracked panel, a stripped fastener.

Every bid includes a contingency line and adder rates for common field fixes. Once you approve, the crew fixes what it finds on the same visit instead of waiting on a new quote.

Exceptions, Block 07Example
UnitFoundResolution
B07-R03-T06Node controller housing damaged, unit not reportingReplaced from site spares, old unit tagged for RMA. Fixed same day
B07-R09-T02Charging panel glass crackedPanel swapped and charging checked, at the agreed adder rate. Fixed same day
An illustration. Each exception carries photos, your approval and the parts used. Units we cannot finish to procedure stay open rather than being signed off.
  1. Found

    The crew spots the issue while working the block.

  2. Flagged the same day

    With photos and a proposed fix, sent from the field when it can be fixed on this visit, otherwise in the evening report.

  3. Approved by you

    Cleared against the contingency line and adder rates already in the bid.

  4. Fixed and logged

    Repaired on the same visit and closed on the unit’s record.

What you get

A site report every evening and an individual record for every unit. Both are yours to keep.

Every evening, a site summary: units closed, exceptions, parts, crew-hours and safety.

Evening report, Block 07Example

10

units done today

140/208

block complete

2

exceptions, with photos

Parts
10 installed, 10 removed and tagged for RMA
Crew-hours
42 (lead and three operators)
Safety
No events. One stop-work, resolved on site
Tomorrow
Rest of row 9 and row 10, outage window confirmed
An illustration of the report sent each evening.

Every tracker, a record you can sample during the work and export in full at closeout.

Unit B07-R08-T04Example record
Work
Charging panel replaced, bracket fitted
Serial out
Scanned on removal, part tagged for RMA
Serial in
Scanned on install
Status
Complete
Crew
Crew 2: a lead and one operator
Checked
Controller charging, no faults on site network. Verified by the crew lead
Exceptions
None
An illustration of what each unit’s record holds.

See a real closeout package

Six pages from a damper arm re-spacing job: 98 of 99 units closed in three field days, 75 found out of tolerance and corrected, 3 exceptions logged (1 worked unit held open). Anonymized, with real counts. Read it page by page

Download the sample (PDF)

Captured in field software built by our own development team. Crews log each tracker on site, even with no cellular signal. You watch progress as the campaign runs and receive a PDF report, spreadsheet and photo export at closeout.

A long row of solar trackers on an Alberta site, under a clear sky with green ground cover in front.

Remote O&M

Keeping a site healthy when nobody is standing on it. We do this today for GameChange Solar tracker sites across a multi-gigawatt portfolio, including five in Alberta.

  1. Alarm comes in

    We watch tracker and controller alarms across the fleet.

  2. Triage

    We sort what needs a truck roll from what can wait for the next visit.

  3. Fix remotely or dispatch

    Configuration, firmware and controller support, or the repair, parts and crew lined up.

  4. Closed and reported

    Tracked to closed, with the fault and fix on the unit’s record.

Performance reporting. Failure trends, recurring faults and availability, so the next campaign targets what is actually breaking.

Technical services

Inspection, controls work and the procedures a campaign depends on, led by our in-house electrical engineer.

Construction quality inspection
Inspection of collector systems, grounding, cabling and tracker installation while the site is being built. Deficiencies are logged against the asset and followed until closed.
Tracker controls and communications
Controller and firmware configuration, site network troubleshooting, SCADA integration of tracker data and scripted field checks.
Commissioning
Commissioning plans, checklists and witnessed checks for solar and BESS equipment.
Retrofit procedures
Step-by-step work instructions and method statements.
Technical reviews
A second set of eyes on field data, closeout packages and contractor work before you accept it.

Safety and prequalification

WCB clearance letter and safety manual are sent on request.

WCB Alberta
Good standing Account 9306770
Insurance
Certificates naming you and the site owner as additional insureds, issued before we mobilize.
Incident record
No lost-time incidents since field work began.
SECOR
In progress Through the Alberta Construction Safety Association; audit planned for spring 2027.

Full safety and prequalification details

On your site

  • Our own crews

    Every dispatch is staffed by Hemora employees. No subcontractors come on site unless they were in our original proposal or you approve them in writing.

  • Your HSE rules and permits

    We follow your site’s HSE policies, permits and lockout rules alongside our own, and never operate or isolate equipment without your written approval.

  • Electrical work

    All electrical diagnostics, isolation and repairs are done by certified journeyperson electricians, or apprentices under their direct supervision, backed by our in-house electrical engineer.

  • OEM campaigns and field fixes

    We work to the OEM’s procedure under the owner’s site rules. If we uncover an issue in the field, we flag it right away and help you fix it.

Request a crew

About three minutes. Tell us the site, the unit count, the part or task, the window and any access rules. We’ll come back with a crew plan and a paid trial block: one block at an agreed rate, so the rest of the campaign is quoted from measured pace.

References and our prequalification pack are available on request.

Suite 500, 112 4th Avenue SW, Calgary, Alberta T2P 0H3

We use what you send only to reply to this request. Privacy questions: privacy@hemora.energy.

Crew request form

Opens in Google Forms in a new tab.

  • Site location or region
  • Approximate tracker or unit count
  • Part, bulletin or task to perform
  • Target dates and outage window
  • Site access rules or prequalification needs
Open the request form